EPC contractor Martifer Solar, the Romanian subsidiary of Martifer SGPS has completed the construction of two photovoltaic plants – one with an installed capacity of 2.03MW located in Halchiu, Brasov County and other of 3.38MW in Magurele, near Bucharest. The project was developed for Eurowind Energy A/S, Martifer being responsible for the engineering, procurement and construction of the two PV plants.
These plants have over 22.000 PV modules installed on ground-mounted fixed structures and are expected to produce approximately 7GW yearly, energy equivalent to the average consumption of some 13.000 inhabitants and which will offset the emission of more than 3.500T of CO2 into the atmosphere, is specified in a press release.
Martifer Solar entered the Romanian PV market in 2012 when the partnership with the Danish company was also set up. Since then, Martifer has built three PV plants for Eurowind Energy A/S. According to latest iHS research report among 700 EPC contractors, Martifer Solar is currently the 4th largest player at the European level and 14th in the World’s PV integrators ranking.