Greentek LED Lighting designed and implemented the intelligent lighting project for the office spaces in AFI Park 2, which became the first building in Romania to be exclusively equipped with such a LED lighting system.
Apart from the new LED lighting system, the office building has been equipped with a software solution for the intelligent management of lighting.
“Illuminating the office spaces in AFI Park 2 was designed with almost 2,000 LEDs, 30 percent fewer than the necessary amount, had they chosen a traditional solution with fluorescent lamps”, said Victor Cotrutz, CEO and founder Greentek LED Lighting.
He further explained that the intelligent control system made possible savings in energy of up to 85 percent and a decrease in energy use by 70 percent, translated into about 100,000 euro savings each year.
Afi Park 2 has a built area of 20.000 square meters and a leasable area of 12.000 square meters, being the second largest building out of the five included in the AFI Park office complex located near AFI Palace Cotroceni shopping center.
LED technology implemented for the AFI Park 2 is produced by Greentek in Romania, at its production facility located in Iasi.